READYMIX CONCRETE PRICES
AUBURN, COLFAX, GRASS VALLEY, NEVADA CITY AREA
PRICES EFFECTIVE MAY 16, 2011
| PRODUCT |
PRICE |
INFO |
MFG LINK |
| Five Sack Concrete |
$95.50 PER C.Y. (CUBIC YARD), 8 CY AND LARGER ORDERS |
 |
|
| Additional Cement |
$7.00 PER SACK PER C.Y. |
 |
|
| Less Cement |
$7.00 PER SACK PER C.Y. |
 |
|
| Pozzolith ® 322N |
$3.50 PER C.Y. |
 |
 |
| DELVO Stabilizer |
$0.40 PER FLUID OUNCE |
 |
 |
| Reobuild ® 1000 Plasticizer |
$0.25 PER FLUID OUNCE |
 |
 |
| Hot & Chilled Water |
$4.50 PER C.Y. (Chilled water available only from Colfax Plant) |
 |
|
| Fiber |
$8.00 PER YARD ADDITIONAL |
 |
 |
| Pozzolith ® NC534 |
$0.15 PER FLUID OUNCE. 10 FLUID OUNCES OFNC-534 PER HUNDRED
WEIGHT OF CEMENT ISEQUIVALENT TO 1% CALCIUM CHLORIDE. |
 |
 |
| ColorFlo |
$3.25 PER POUND, PER CUBIC YARD PLUS $20.00 PER WASH OUT.
AMOUNT OF COLOR PER C.Y. WILL VARYWITH CEMENT CONTENT
& DESIRED COLOR OF THE CONCRETE. |
 |
 |
| Fly Ash |
ADDITIVE FOR CEMENT UP 25%. ENVIRONMENTALLY SAFE. NO EXTRA CHARGE. |
 |
 |
| Gunite |
$10.00 PER YARD ADDITIONAL
$60.00 PER LOAD MINIMUM |
 |
|
- ONE CLEAN UP LOAD OF LESS THAN 8 C.Y. PER 8 C.Y. AND LARGER ORDER PER DAY ALLOWED.
- ORDERS OF LESS THAN 7 C.Y., ADDITIONAL CLEAN-UP LOADS, AND SATURDAY ORDERS, 5 SACK MIX WILL BE CHARGED AT $95.50 PER C.Y. FOR MATERIAL PLUS ROUND TRIP TRUCK TIME AT $102.00 PER HOUR ($1.70 PER MIN.) ONE HOUR MINIMUM TRUCK TIME.
- TIME AND MATERIAL (T&M) ORDERS WILL BE CHARGED AT $93.50 PER C.Y. PLUS ROUND TRIP TRUCK TIME AT $102.00 PER HOUR ($1.70 PERMINUTE). ONE HOUR MINIMUM TRUCK TIME.
- FIVE MINUTES PER C.Y. DUMP TIME ALLOWED, TRUCK TIME THEREAFTER AT $102.00 PER HOUR.
- OVERTIME (TIME AND ONE-HALF) WILL BE CHARGED AFTER 3:30 PM AT THE RATE OF $15.00 PER HOUR. DOUBLE TIME WILL BE CHARGED AFTER 12 HOURS AT THE RATE OF $30.00 PER HOUR ADDITIONAL.
- CUSTOMER IS RESPONSIBLE FOR STUCK TIME AT $102.00 PER HOUR PLUS TOWING COSTS. OVERTIME AND DOUBLE TIME WILL BE CHARGED WHEN APPLICABLE.
- $4.00 PER C.Y. DISCOUNT FOR CASH. CUSTOMERS WITH CURRENT ACCOUNTS WILL RECEIVE $4.00 PER C.Y. DISCOUNT IF PAYMENT IS RECEIVED BY THE 10TH.
- ALL PRICES ARE SUBJECT TO CHANGE AND SALES TAX.